Professional Petroleum Equipment

Supplier

poland XJ550 workover rig

XJ550 (100 tons) workover rig is specially used for drilling and workover operation in oilfields.

Category:

polandWorkover Rig

Product Description

XJ550 (100 tons) workover rig is specially used for drilling and workover operation in oilfields. Its chassis adopts 10×8 drive. The power unit adopts CAT diesel engine and Allison transmission case. The winch is of a double-drum structure. The maximum hook load is 1350 kN. The derrick is of a rectangular portal split outfit structure with a double-layer platform. It is 35 m high. Rotary table, derrick floor, swivel and other drilling components are optional. The rig can complete drilling independently.

Product model

XJ550 (100 tons)

Nominal minor repair depth

Φ73mm (2-7/8" thickened tubing)

m

7000

Nominal overhaul depth

Φ73mm (2-7/8" drill pipe)

m

5800

Φ88.9mm (3-1/2" drill pipe)

m

4500

Φ114mm (4-1/2" drill pipe)

m

3600

Drilling depth

m

2000

Large hook load rating

Kw

1000

Large hook maximum load

Kw

1350

Engine model

 

CAT  C15

Engine power

Kw(hp)

354(475)

Gearbox model

 

Allison M5610AR

Chassis drive form

 

10*8

Approach/departure angle

 

25°/16°

Minimum ground clearance

mm

310

Derrick height

m

35

Derrick form

 

Front open type double-section hydraulic lifting and telescopic

Effective number of ropes

 

8(4*5)

Lifting wire rope diameter

mm

F26

Mobile state dimensions (length * width * height)

m

19.87*3.10*4.2

Total mass of the whole machine

medical history

53000

Drum form

 

Single/double drum

The main drum assists the brakes

 

Pneumatically controlled disc brakes